11 McElroy Street, Moncton, NB E1C 9T2
506-854-4634
jobs@birchhillconst.com
Phase 2B & Watermain Loop
City of Dieppe:
Installation of approximately 4km of 14″ watermain including a section directional drilled under a wetland. Also installed a check valve chamber, wastewater lift station and associated road work.